Cloud Migration & Architecture


We've migrated 5+ enterprises across fintech, healthcare, and logistics, with zero critical incidents. That's not luck — it's the result of planning every migration carefully, mapping every dependency, and owning the process end to end, from initial assessment through post-migration optimization.

Zero downtime methodology
AWS/Azure/GCP certified
HIPAA/PCI-DSS ready
90-day hypercare included
0+
Enterprise migrations completed
Zero critical incidents
0
Critical post-migration incidents
Across all client migrations
0%
Average cost reduction
vs. on-premises infrastructure
0 wk
Median migration timeline
Mid-size enterprise workloads
Why Migrations Fail

Six risks we
engineer away.

These aren't edge cases. They're the six most common reasons enterprise cloud migrations go over budget, over schedule, or over the news.

Dependency Hell

Undocumented dependencies between applications cause post-migration failures that take days to diagnose. Most teams discover 40% more dependencies than they knew about.

Hidden dependencies cause 60% of migration overruns

Cloud Cost Shock

Lift-and-shift without optimization creates cloud bills 3× higher than on-premises. Over-provisioning, unattached volumes, and idle resources compound monthly.

35% of cloud spend is wasted on avg. (Flexera 2024)

Database Migration Complexity

Database migrations require meticulous CDC setup, cutover coordination, and validation. Poor planning leads to data inconsistency or hours of downtime at cutover.

Database issues cause 45% of migration failures

Security Gaps Post-Migration

Default cloud configurations are insecure. IAM policies too permissive, storage public, secrets in code. Security retrofitted after migration is harder than building it in.

71% of cloud breaches are from misconfiguration

Downtime Risk

Business-critical systems migrating during business hours, or teams without tested rollback plans, create unnecessary risk for production incidents.

Average cost of 1 hour enterprise downtime: $300K

Skill Gaps in the Target Environment

Your on-premises team knows your current environment. Cloud operations require different skills, different tooling, and different runbooks. The knowledge transfer gap is real.

Skills gaps extend post-migration stabilization by 6+ weeks
What we cover

We read your architecture before we touch anything.

Most migrations fail because teams underestimate dependencies. We map everything first — then move it.

Migration Assessment & Planning

We audit your existing infrastructure before we move anything. Application dependencies, data flows, compliance requirements — mapped before the first Terraform module is written. You won't discover dependencies at cutover.

AWSAzureGCPAssessment Tools

Multi-Cloud Architecture Design

AWS, Azure, GCP — or all three. We design for your actual workload requirements, not vendor preference. We'll tell you honestly which cloud fits which workload, and why.

TerraformPulumiCDKAnsible

Zero-Downtime Migration Execution

Blue-green deployments, canary releases, CDC replication, and traffic shifting strategies. Every migration without a single critical incident — not luck, but methodology.

Blue-GreenCanaryCDCTraffic Shifting

Cloud Cost Architecture

Cloud bills that grow forever are a sign of poor architecture. We right-size instances from day one, implement auto-scaling, set up cost anomaly detection, and reserve capacity where it saves money.

AWS Cost ExplorerSpot InstancesSavings PlansFinOps

Security-First Migration

VPC design, encryption at rest and in transit, IAM least-privilege, and network segmentation — all implemented during migration. Security that's designed in, not bolted on.

IAMVPCKMSSecurity Hub

Post-Migration Optimization

90-day post-migration performance review, cost optimization pass, and reliability improvements. Most clients see 30–40% cost reduction vs. on-premises within six months.

Cost OptimizationPerformanceSREFinOps
Our Methodology

Four phases.
One team. No handoffs.

01

Discovery & Assessment

Weeks 1–2
  • Inventory all applications and infrastructure dependencies
  • Classify workloads by migration strategy (rehost/replatform/refactor)
  • Identify compliance and data residency requirements
  • Produce architecture recommendations and cost estimates
02

Landing Zone & Foundation

Weeks 2–4
  • Set up AWS/Azure/GCP landing zone (VPC, IAM, networking)
  • Configure security baseline, monitoring, and logging
  • Deploy CI/CD pipeline for infrastructure as code
  • Create DR architecture, runbooks, and rollback procedures
03

Migration & Validation

Weeks 3–10
  • Migrate workloads by priority (low-risk first)
  • Run parallel environments for thorough validation
  • Load testing and performance benchmarking in target
  • Security testing and compliance verification
04

Cutover & Stabilize

Weeks 8–12
  • Planned traffic cutover with instant rollback capability
  • Hypercare support for 30 days post-cutover
  • Cost optimization and right-sizing review
  • Knowledge transfer and team enablement
Technology

The tools we migrate with.

Cloud Platforms
AWSMicrosoft AzureGoogle CloudOracle CloudIBM Cloud
Infrastructure as Code
TerraformAWS CDKPulumiAnsibleCloudFormation
Container Platforms
KubernetesEKSAKSGKEDockerHelm
Database Migration
AWS DMSAzure Database MigrationDebezium CDCpg_dumpmysqldump
Monitoring & Ops
DatadogPrometheusGrafanaCloudWatchPagerDuty
Security & Compliance
WizPrisma CloudHashiCorp VaultAWS Security HubSnyk
Case Studies

Migrations that
actually worked.

Financial Services
Core Banking Migration
The Challenge

A regional bank needed to migrate their core banking platform — a 15-year-old on-premises system processing 2.4M daily transactions — to AWS. Previous migration attempt by a different vendor had been abandoned after six months.

Our Approach

We started with a 3-week assessment that revealed 47 undocumented integrations the previous vendor had missed. Designed a phased migration using CDC replication for the Oracle database, ran parallel environments for 8 weeks of validation, and orchestrated a 4-hour Sunday morning cutover.

Outcome

4-hour cutover. Zero transaction failures. 38% infrastructure cost reduction. Regulatory approval obtained before cutover. The platform now handles 3× peak load with zero manual scaling.

4 hrs
Cutover time
vs. 3-day estimate
0
Transaction failures
across cutover
38%
Cost reduction
vs. on-premises
99.99%
Availability
12-month post-migration
Healthcare
HIPAA Compliant Migration
The Challenge

A hospital network with 14 applications containing PHI needed to migrate to Azure. HIPAA compliance, data residency, and the BAA requirement made this more complex than a typical workload migration.

Our Approach

We mapped every PHI data flow before touching any infrastructure. Designed a HIPAA-compliant Azure landing zone with appropriate encryption, audit logging, and access controls. Validated compliance posture with independent security audit before cutover.

Outcome

Migration completed on schedule. Zero PHI exposure events. HIPAA audit completed and passed. 41% reduction in infrastructure management overhead. Clinical staff noticed no service interruption.

0
PHI exposure events
during and after migration
Pass
Compliance audit
HIPAA first attempt
−41%
Mgmt. overhead
infrastructure ops time
0 min
Downtime
clinical service
Retail & Logistics
Multi-Cloud Architecture
The Challenge

A logistics company with 200+ vendors wanted to move from a single on-premises data center to a multi-cloud architecture — primary workloads to AWS, DR on Azure — to eliminate single points of failure.

Our Approach

Designed a multi-cloud architecture using Terraform for consistent IaC across both providers. Implemented cloud-agnostic application layer with abstracted cloud services. Built automated failover testing that runs weekly.

Outcome

Multi-cloud architecture live in 14 weeks. Automated weekly DR drills passing. RPO reduced from 24 hours to 4 hours. RTO reduced from 8 hours to 45 minutes. 29% blended cloud cost reduction.

90%
RTO improvement
8hrs to 45min
83%
RPO improvement
24hrs to 4hrs
29%
Cost reduction
blended cloud bill
14 wk
Migration timeline
full multi-cloud
Common Questions

What migration teams ask us.

Migration assessment available

Still on-premises because the last migration went badly?

We hear this often. Tell us what happened — we'll explain exactly what we would have done differently and whether we can help you get there now.

Plan the migration
Free assessment
Fixed-price option available
Zero-downtime guarantee